Home> Business Scope>EPC Service

EPC Engineering Turnkey

For the past 40 years, CTCI MAC has remained focused in mechanical equipment manufacturing. In June 2011, CTCI MAC merged with CTCI Kaohsiung Operations, integrating its Project and Engineering teams, thus evolving as a turnkey engineering company. This initiative greatly enhances CTCI MAC’s capacity and capability to provide our customers with one-stop Total Solution services of all types of engineering projects.

EPC turnkey engineering services include petrochemicals, oil refining, specialized chemicals, and general industrial new plant or de-bottleneck expansion projects. We have persistently delivered satisfactory first-class engineering quality at the most economical cost, irrespective of project scale. Our services have been well received by our clients.


FPCC 330 tons/day Spent Acid Recovery Plant (SAR#2), EPC Turnkey

■ FPCC 330 tons/day Spent Acid Recovery Plant (SAR#2), EPC Turnkey

In 2011, CTCI MAC successfully completed the “CPC Dalin Diesel Hydrodesulphurization (HDS) Plant Turnkey Project”, firmly positioning itself in the domestic small and medium-sized EPC engineering market.

CPC Dalin Plant Diesel Hydro-Desulfurization Plant

■ CPC Dalin Diesel Hydrodesulphurization Plant

In May 2016, we completed the Formosa Petrochemical “330 tons/day Spent Acid Recovery plant (SAR#2) turnkey project”. The plant is currently in full operational service. The project scope included detail design and construction service, based MECS licensed process. The project started on March 13, 2013 and was handed over on May 31, 2016. The project not only met the owner schedule, CTCI MAC received a Certificated of Appreciation for an outstanding performance to complete SAR#2 project.

At the end of November 2016, CTCI MAC commenced detail design work for Formosa Petrochemical’s “H-7730 Flare Stack Reinstatement Work”. In May 2017, CTCI MAC proceeded with jobsite construction work. The main derrick weighs up to 1395 metric tons with a total vertical height of 140m. The target project completion date is October 2018.

FPCC H-7730 Flare Stack Reinstatement Work

■ FPCC H-7730 Flare Stack Reinstatement Work

In 2017, CTCI MAC was awarded IFSC’s HHCR construction turnkey project, endorsing CTCI MAC’s professional capabilities, experience and service quality in project planning, design, construction, supervision and construction management.

Further to oil refining and petrochemicals, CTCI MAC has also made its presence in power plants.
In 2017, CTCI MAC successfully completed the erection of two new 800MW, SOVR boiler (Stationary Once-Through Variable Pressure Reheat Type Boiler) for the TPC Ta-Lin Power Plant. CTCI MAC is accredited by the ASME for N, NPT, NA, NS, U, U2, S and PP stamp. With persistent professional quality, CTCI MAC helped the owner to obtain the boiler certificate S-Stamp, and the boilers are placed in successful operation in 2018.

TPC Ta-Lin Plant Unit 1&2 Boiler Pressure Parts Installation Work (Furnace)

■ TPC Ta-Lin Plant Unit 1&2 Boiler Pressure Parts Installation Work (Furnace)

TPC Ta-Lin Plant Unit 1&2 Boiler Pressure Parts Installation Work (Vestibule)

■ TPC Ta-Lin Plant Unit 1&2 Boiler Pressure Parts Installation Work (Vestibule)

Our Expertise

  • Engineering management
  • Feasibility assessment and front-end project planning
  • Engineering design
  • Procurement service
  • Construction and erection
  • Commissioning

Market Coverage

Hydrocarbon
  • Petroleum refining
  • Petrochemical processing
  • Liquefied natural gas (LNG)
Non-Hydrocarbon
  • Power plant
  • Environmental work
  • General industrial works

Featured Projects

CPC Dalin Diesel Hydrodesulphurization Plant Turnkey Project

In 2011, CTCI MAC successfully completed the “CPC Dalin Diesel Hydrodesulphurization Plant Turnkey Project”. The plant capacity is 50,000 BPSD.


FPCC 330 tons/day Spent Acid Recovery Plant (SAR#2) Turnkey Project

In May 2016, we completed Formosa Petrochemical Company’s “330 tons/day Spent Acid Recovery plant (SAR#2) turnkey project”.


FPCC H-7730 Flare Stack Reinstatement Work

In November 2016, CTCI MAC began work on Formosa Petrochemical Company’s “H-7730 Flare Stack Reinstatement Work”. The main derrick weighs up to 1395 metric tons with a total vertical height of 140m.


IFSC HHCR Construction Turnkey Project

In 2017, CTCI MAC was awarded IFSC’s HHCR construction turnkey project.


TPC Ta-Lin Power Plant SOVR Boiler Erection Work

In 2017, CTCI MAC successfully completed the erection of two new 800MW SOVR boiler for TPC Ta-Lin Power Plant.

CTCIM Major Projects Summary Download PDF