Formosa Petrochemical Corporation

  • OWNER Formosa Petrochemical Corporation
  • Project Waste Sulfuric Acid Recovery plant #2 (330 tons / day)
  • Description
    • Preparation of FEED
    • Preparation Detail Engineering
    • HAZOP and VE reviews
    • Construction
  • Work Scope E/C
  • Location Yunlin County Mai Liu Township
  • Features & Difficulties
    • CTCI MAC was awarded by owner for good construction quality and schedule control.
    • Zero accident during construction.
CPC Corporation, Taiwan (CPC)

  • OWNER CPC Corporation, Taiwan (CPC)
  • Project RFCC Equipment fabrication and assembly
  • Description
    • Equipment prefabrication
    • On site assembly
  • Work Scope P/C
  • Location Kaohsiung Ta-Lin Refinery
  • Features & Difficulties
    • • Giant Column fabrication and lifting operation– over 1,000 tons
    • Column V-3130, ID 7.5m, Length: 90m, Thickness: 74t, Weight : 1,321 tons
    • Column V-3150, ID 7.5m, Length: 95m, Thickness: 72t, Weight : 1,401 tons
Taiwan Power Company

  • OWNER Taiwan Power Company
  • Project Internal parts and components assembly of Reactor Pressure Vessel
  • Description
    • Nuclear Product Provider
    • Reactor Pressure Vessel Installation
  • Work Scope P/C
  • Location Lungmen nuclear power plant
  • Features & Difficulties
    • Operated in Limited space, high proficiency required, not allowed for doing it again if it faired at 1st time.
    • Apply special welding machine.
Formosa Petrochemical corporation

  • OWNER Formosa Petrochemical corporation
  • Project RCC#1/2 Reactor & Generator renovation engineering.
  • Description
    • Equipment prefabrication
    • Replacement of End plate & Cyclone separator system.
  • Work Scope C
  • Location Yunlin County Mai Liu Township
  • Features & Difficulties
    • • Regenerator R-5102 and Reactor R-5402 Top Head with Cyclones, ID 13.4m, SA-516-70/A240-304H, L: 19.7m, W: 389tons (Inc: Refractory Lining)
    • Currently, it is the case of the most heaviest lifting weight in Taiwan.
Formosa Chemicals & Fibre corporation

  • OWNER Formosa Chemicals & Fibre corporation
  • Project 2012 ARO-2 palnt plant examination service work
  • Description
    • Annual shut down inspection work service :
      Full plant equipments examination / washing
  • Work Scope P/C
  • Location Yunlin County Mai Liu Township
  • Features & Difficulties
    • Completion within 45 days as scheduled; maximum of 609 workers per single day.
    • Completion of 45,015 DB repairing